The reaction to fire of pipe insulation products has been highlighted an emerging fire safety risk. In this article, Chris Ridge, Technical Director of Thermal Insulation Contractors Association (TICA) explains why PEF (polyethylene) pre-insulated MLCP (multi-layer composite pipe) products should be of particular concern to developers of Higher Risk Buildings.
Introduction
Thermal insulation of pipework is often an afterthought. However, building services play a significant role in any modern building, and careful attention should be paid to the reaction to fire of pipe insulation. PEF pre-insulated MLCP products have been used within individual apartments for several. However, these products are increasingly being used in communal areas of higher risk buildings (HRBs) where there is an apparent blind spot concerning fire safety risks and minimum thermal performance criteria.
Guidance concerning thermal insulation and reaction to fire
Building Services specifications typically state a minimum reaction to fire performance of B-s3, d2. This allows for a large range of suitable products including mineral wool, nitrile rubber and phenolic foams. This would also be the typical minimum for communal areas (e.g. corridor runs) with specification sometimes being more exacting.
BS 5422:2023 (Thermal insulating materials for pipes, tanks, vessels, ductwork and equipment operating within the temperature range –40 °C to +700 °C. Method for specifying) specifies a minimum Euroclass reaction to fire of C-s3, d2 for dwellings and B-s3, d2 for non-dwellings.
Further considerations are introduced in section 27.2.2 of BS 9991:2024 (Fire safety in the design, management and use of residential buildings. Code of practice), where B-s3, d2 is stated as a minimum where services are run horizontally within common access corridors and lobbies, including corridor access for firefighting shafts (unless enclosed with fire-resisting construction).
Pre-insulated MLCP Products
Pre-insulated MLCP products are typically comprised of an MLCP pipe insulated with a PEF polyethylene foam and finished with a protective polyethylene sheathing.
Traditional pipe insulation products are subject to harmonised testing standards and can therefore be specified based on clear parameters. However, when thermal insulation products are hybridised with other products (as in the case of PEF pre-insulated MLCP products), they form new products for which there is no existing harmonised standard.
It is evident that some PEF pre-insulated MLCP product manufacturers have been declaring a reaction to fire for their product in line with the harmonised standard for PEF (BS EN 14313). This is misleading because it suggests that the products have been tested under the same conditions as those specified for traditional insulation products.
With manufacturers of PEF pre-insulated MLCP products declaring a reaction to fire anywhere between a Euroclass B and a Euroclass E, it appears that the approach to testing these products is at best inconsistent.
PEF pre-insulated MLCP pipework is by no means restricted to dwellings, and large cable tied bundles of these pipes are an increasingly common site in communal areas in higher risk buildings (HRBs).
Thermal Performance

“Hot” and “Cold” PEF pre-insulated MLCP products cable tied together
PEF pre-insulated MLCP products are manufactured with limited insulation thickness options. In terms of thermal performance there is a wide range of thermal insulation specifications, and a one-size-fits-all approach does not always allow for a diverse range of specification requirements to be met. And, in many cases, the minimum base level standards are not even being met. Inadequate levels of thermal insulation can lead to issues such as overheating and condensation.
Installer Competence
Installer competence is a key requirement under the Building Safety Act. At the heart of this requirement is the responsibility to employ competent teams (those with the correct skills, knowledge, experience and behaviours for the appointed task).
Thermal Insulation is a specialist trade with a clear competence framework. All specialist trade contractors should hold the appropriate card. For thermal insulation, this is a TICA Thermal Insulator CSCS Skill Card. Thermal insulation specialists are not typically appointed for the installation of flexible foams in small dwelling applications, but communal service installations on large residential projects are a different case entirely.
However, thermal insulation is all often considered an “extension” of the pipe system, with pipework contractors assuming the role of “thermal insulation specialist” and taking the responsibility for product selection and installation.
The problems often occur when contractors not competent in the thermal insulation trade (e.g. pipework contractors) complete the installation “in-house” instead of appointing a suitably competent specialist.
In many cases, products of concern are being installed on Higher Risk Buildings (HRB’s) where there is a requirement for a Duty Holder. Under the Building Safety Act, Duty Holders have specific legal requirements to ensure safety throughout the lifecycle the building. For the duty holder, the case for compliance is only as strong as the weakest specialist sub-contractor employed on a project.
Conclusion
The reaction to fire of thermal insulation products has been highlighted as an emerging risk. PEF pre-insulated MLCP is not the only example of an emerging risk relating to thermal insulation, but it is one with a significant blind spot. When contractors who are not knowledgeable about thermal insulation products take responsibility for their selection and installation, the risks are rarely understood.
How can we promote good practice?
Be precise about the insulation material you wish to specify – does the product have a suitable reaction to fire performance?
Consider if the insulation material is being used in a dwelling or non-dwelling scenario and bear in mind that different specifications apply.
Ensure that a suitably competent thermal insulation specialist is appointed to carry out thermal insulation work.
Ask the manufacturer of any pre-insulated pipework product for a copy of the fire test report and seek further advice regarding the suitability of the product.
And if in doubt, please contact me at TICA – we will do our best to help.
https://tica-acad.co.uk/